Facts 

Name:SHWN DR over I-635 HIGHWAY
Structure number:999963501050321
Location:1.02 MILES N I-35
Purpose:Carries highway over highway
Route classification:Minor Arterial (Urban) [16]
Length of largest span:90.9 ft. [27.7 m]
Total length:269.4 ft. [82.1 m]
Roadway width between curbs:58.1 ft. [17.7 m]
Deck width edge-to-edge:70.2 ft. [21.4 m]
Vertical clearance below bridge:16.7 ft. [5.1 m]
Skew angle:19°
Owner:State Highway Agency [01]
Year built:1971
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:4
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Epoxy Overlay [5]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:12,210 [as of 2004]
Truck traffic:3% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:61.8 tons [56.2 metric tons]
Inventory rating:25.0 tons [22.7 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:65.4
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$539,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:10,326 [as of 1986]
Truck traffic:9% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:61.4 tons [55.8 metric tons]
Inventory rating:24.8 tons [22.5 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:68.4
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,537,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:10,326 [as of 1986]
Truck traffic:9% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:47.1 tons [42.8 metric tons]
Inventory rating:30.4 tons [27.6 metric tons]
Sufficiency rating:93.1