I-635 NB HIGHWAY over KANSAS RIVER UP DRAINAGE

Map 

Coordinates:
+39.10164, -94.67936
39°06'06" N, 94°40'46" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:I-635 NB HIGHWAY over KANSAS RIVER UP DRAINAGE
Structure number:999963501050451
Location:0.27 MILES S I-70
Purpose:Carries highway over highway, waterway, and railroad
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:265.1 ft. [80.8 m]
Total length:2203.2 ft. [671.5 m]
Roadway width between curbs:51.2 ft. [15.6 m]
Deck width edge-to-edge:53.8 ft. [16.4 m]
Vertical clearance below bridge:16.1 ft. [4.9 m]
Skew angle:21°
Owner:State Highway Agency [01]
Year built:1976
Year reconstructed:2005
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:5
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Low slump Concrete [4]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:39,450 [as of 2009]
Truck traffic:7% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:74.8 tons [68.0 metric tons]
Inventory rating:44.9 tons [40.8 metric tons]
Sufficiency rating:93.3
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$3,892,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:36,660 [as of 1999]
Truck traffic:7% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:59.4 tons [54.0 metric tons]
Inventory rating:31.7 tons [28.8 metric tons]
Sufficiency rating:84.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$11,400,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:37,730 [as of 1990]
Truck traffic:8% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Very Good [8 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:38.1 tons [34.6 metric tons]
Inventory rating:28.5 tons [25.9 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:72.2
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$3,876,000