Facts
| Name: | I670 WB HIGHWAY over US69(7TH ST) 4 RAMPS |
| Structure number: | 999967001052411 |
| Location: | 0.29 MI E MILL ST. |
| Purpose: | Carries highway over highway |
| Route classification: | Principal Arterial - Interstate (Urban) [11] |
| Length of largest span: | 265.1 ft. [80.8 m] |
| Total length: | 1498.4 ft. [456.7 m] |
| Roadway width between curbs: | 56.1 ft. [17.1 m] |
| Deck width edge-to-edge: | 58.7 ft. [17.9 m] |
| Vertical clearance below bridge: | 16.4 ft. [5.0 m] |
| Skew angle: | 37° |
| Owner: | State Highway Agency [01] |
| Year built: | 1990 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18+Mod / HS 20+Mod [6] |
| Number of main spans: | 15 |
| Main spans material: | Steel continuous [4] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Low slump Concrete [4] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 24,350 [as of 2009] |
| Truck traffic: | 8% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Very Good [8 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 74.8 tons [68.0 metric tons] |
| Inventory rating: | 44.9 tons [40.8 metric tons] |
| Sufficiency rating: | 93.7 |
| Recommended work: | Bridge deck replacement with only incidental widening. [37] |
| Estimated cost of work: | $2,895,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 24,280 [as of 1999] |
| Truck traffic: | 7% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Very Good [8 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 74.2 tons [67.5 metric tons] |
| Inventory rating: | 44.6 tons [40.5 metric tons] |
| Sufficiency rating: | 93.7 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $7,752,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 18,705 [as of 1990] |
| Truck traffic: | 15% of total traffic |
| Deck condition: | Very Good [8 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Very Good [8 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 38.1 tons [34.6 metric tons] |
| Inventory rating: | 28.5 tons [25.9 metric tons] |
| Sufficiency rating: | 92.5 |