Share:

I670 WB HIGHWAY over US69(7TH ST) 4 RAMPS

Map 

Coordinates:
+39.09534, -94.62613
39°05'43" N, 94°37'34" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:I670 WB HIGHWAY over US69(7TH ST) 4 RAMPS
Structure number:999967001052411
Location:0.29 MI E MILL ST.
Purpose:Carries highway over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:265.1 ft. [80.8 m]
Total length:1498.4 ft. [456.7 m]
Roadway width between curbs:56.1 ft. [17.1 m]
Deck width edge-to-edge:58.7 ft. [17.9 m]
Vertical clearance below bridge:16.4 ft. [5.0 m]
Skew angle:37°
Owner:State Highway Agency [01]
Year built:1990
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:15
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Low slump Concrete [4]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:24,350 [as of 2009]
Truck traffic:8% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:74.8 tons [68.0 metric tons]
Inventory rating:44.9 tons [40.8 metric tons]
Sufficiency rating:93.7
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$2,895,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:24,280 [as of 1999]
Truck traffic:7% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:74.2 tons [67.5 metric tons]
Inventory rating:44.6 tons [40.5 metric tons]
Sufficiency rating:93.7
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$7,752,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:18,705 [as of 1990]
Truck traffic:15% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:38.1 tons [34.6 metric tons]
Inventory rating:28.5 tons [25.9 metric tons]
Sufficiency rating:92.5