US0090 over DRAIN CANAL

Map 

Coordinates:
+29.91157, -90.22846
29°54'42" N, 90°13'42" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:US0090 over DRAIN CANAL
Structure number:022600051002552
Location:2.8 MI WEST OF US 90B
Purpose:Carries highway over waterway
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:38.1 ft. [11.6 m]
Total length:78.1 ft. [23.8 m]
Roadway width between curbs:23.0 ft. [7.0 m]
Deck width edge-to-edge:29.9 ft. [9.1 m]
Owner:State Highway Agency [01]
Year built:1940
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:2
Main spans material:Concrete [1]
Main spans design:Tee beam [04]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:17,880 [as of 2009]
Truck traffic:14% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:52.5 tons [47.7 metric tons]
Inventory rating:31.7 tons [28.8 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:50.8
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$400,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:15,076 [as of 1997]
Truck traffic:14% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Poor [4 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:45.5 tons [41.4 metric tons]
Inventory rating:21.8 tons [19.8 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:37.4
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$400,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:13,757 [as of 1991]
Truck traffic:14% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:45.5 tons [41.4 metric tons]
Inventory rating:21.8 tons [19.8 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:53.4
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$400,000