Facts 

Name:US0090 over MISSISSIPPI RIVER
Structure number:022600060100001
Location:.01 MI SOUTH OF LA 48
Purpose:Carries highway over highway, waterway, and railroad
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:790.1 ft. [240.8 m]
Total length:9163.5 ft. [2792.9 m]
Roadway width between curbs:36.1 ft. [11.0 m]
Deck width edge-to-edge:44.9 ft. [13.7 m]
Vertical clearance below bridge:149.9 ft. [45.7 m]
Owner:State Highway Agency [01]
Year built:1936
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 13.5 / H 15 [2]
Number of main spans:3
Main spans material:Steel continuous [4]
Main spans design:Truss - Thru [10]
Deck type:Concrete Cast-in-Place [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:48,000 [as of 2009]
Truck traffic:7% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Countermeasures have been installed to mitigate an existing problem with scour. [7]
Operating rating:33.7 tons [30.6 metric tons]
Inventory rating:15.8 tons [14.4 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:33.2
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$35,734,000

2000 Inspection 

Average daily traffic:12,884 [as of 1997]
Truck traffic:9% of total traffic
Evaluation:Not applicable [N]

1992 Inspection 

Status:Posted for load [P]
Average daily traffic:47,881 [as of 1988]
Truck traffic:7% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:33.7 tons [30.6 metric tons]
Inventory rating:15.8 tons [14.4 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:32.2
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$35,734,000