US0090 over CHEF MENTEUR PASS
Map
Coordinates:
+30.06573, -89.8063030°03'57" N, 89°48'23" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | US0090 over CHEF MENTEUR PASS |
| Structure number: | 023600060500001 |
| Location: | 3.7 MI EAST OF US 11 |
| Purpose: | Carries highway over waterway |
| Route classification: | Minor Arterial (Rural) [06] |
| Length of largest span: | 270.0 ft. [82.3 m] |
| Total length: | 1174.9 ft. [358.1 m] |
| Roadway width between curbs: | 20.0 ft. [6.1 m] |
| Deck width edge-to-edge: | 21.3 ft. [6.5 m] |
| Vertical clearance above deck: | 14.1 ft. [4.3 m] |
| Vertical clearance below bridge: | 12.8 ft. [3.9 m] |
| Owner: | State Highway Agency [01] |
| Year built: | 1930 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | M 13.5 / H 15 [2] |
| Main span material: | Steel [3] |
| Main span design: | Movable - Swing [17] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Bituminous [6] |
2010 Inspection
| Status: | Posted for load [P] |
| Average daily traffic: | 2,600 [as of 2009] |
| Truck traffic: | 7% of total traffic |
| Deck condition: | Fair [5 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Channel protection: | Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5] |
| Pier/abutment protection: | In place and functioning [2] |
| Scour condition: | Bridge is scour critical; field review indicates that extensive scour has occurred at bridge foundations. [2] |
| Operating rating: | 30.7 tons [27.9 metric tons] |
| Inventory rating: | 18.8 tons [17.1 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 41.1 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $4,582,000 |
2000 Inspection
| Status: | Posted for load [P] |
| Average daily traffic: | 2,391 [as of 1988] |
| Truck traffic: | 7% of total traffic |
| Deck condition: | Fair [5 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Poor [4 out of 9] |
| Channel protection: | Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5] |
| Pier/abutment protection: | In place and functioning [2] |
| Scour condition: | Bridge is scour critical; field review indicates that extensive scour has occurred at bridge foundations. [2] |
| Operating rating: | 30.7 tons [27.9 metric tons] |
| Inventory rating: | 17.8 tons [16.2 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 14.8 |
| Recommended work: | Other structural work, including hydraulic replacements. [38] |
| Estimated cost of work: | $4,582,000 |
1992 Inspection
| Status: | Posted for load [P] |
| Average daily traffic: | 2,391 [as of 1988] |
| Truck traffic: | 7% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Channel protection: | Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6] |
| Pier/abutment protection: | In place and functioning [2] |
| Scour condition: | Scour calculation/evaluation has not been made. [6] |
| Operating rating: | 34.7 tons [31.5 metric tons] |
| Inventory rating: | 14.9 tons [13.5 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 41.8 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $4,582,000 |