Share:

I0010 over LAKE PONTCHARTRAIN

Map 

Coordinates:
+30.15447, -89.85491
30°09'16" N, 89°51'18" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:I0010 over LAKE PONTCHARTRAIN
Structure number:023604501700002
Location:.01 MI EAST OF US 11
Purpose:Carries highway over waterway
Route classification:Principal Arterial - Interstate (Rural) [01]
Length of largest span:200.1 ft. [61.0 m]
Total length:28546.3 ft. [8700.5 m]
Roadway width between curbs:40.0 ft. [12.2 m]
Deck width edge-to-edge:45.6 ft. [13.9 m]
Vertical clearance below bridge:63.0 ft. [19.2 m]
Owner:State Highway Agency [01]
Year built:1963
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]

2010 Inspection 

Status:Posted for load [P]
Average daily traffic:28,800 [as of 2009]
Truck traffic:7% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Critical [2 out of 9]
Substructure condition:Critical [2 out of 9]
Channel protection:Bank and embankment protection is severely undermined. River control devices have severe damage. Large deposits of debris are in the channel. [4]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:89.1 tons [81.0 metric tons]
Inventory rating:53.5 tons [48.6 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:33.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$111,325,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:28,254 [as of 1997]
Truck traffic:7% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:47.5 tons [43.2 metric tons]
Inventory rating:33.7 tons [30.6 metric tons]
Sufficiency rating:80.2
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:23,579 [as of 1991]
Truck traffic:7% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:36.6 tons [33.3 metric tons]
Inventory rating:21.8 tons [19.8 metric tons]
Sufficiency rating:66.4