I0010 over LA 611-9 (METAIRIE ROAD)
Map
Coordinates:
+29.98110, -90.1138729°58'52" N, 90°06'50" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | I0010 over LA 611-9 (METAIRIE ROAD) |
| Structure number: | 023604509001162 |
| Location: | I-10 OVER LA 611-9 |
| Purpose: | Carries highway overpass over highway |
| Route classification: | Principal Arterial - Interstate (Urban) [11] |
| Length of largest span: | 89.9 ft. [27.4 m] |
| Total length: | 1360.0 ft. [414.5 m] |
| Roadway width between curbs: | 67.3 ft. [20.5 m] |
| Deck width edge-to-edge: | 70.5 ft. [21.5 m] |
| Vertical clearance below bridge: | 19.4 ft. [5.9 m] |
| Owner: | State Highway Agency [01] |
| Year built: | 1962 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 20 |
| Main spans material: | Steel [3] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 44,520 [as of 2009] |
| Truck traffic: | 20% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 59.4 tons [54.0 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Sufficiency rating: | 96.0 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 72,673 [as of 1998] |
| Truck traffic: | 20% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Operating rating: | 53.5 tons [48.6 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 77.0 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $5,304,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 73,409 [as of 1991] |
| Truck traffic: | 20% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Operating rating: | 53.5 tons [48.6 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Sufficiency rating: | 68.0 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |