Share:

I0010 over I-10 EAST & WEST

Map 

Coordinates:
+29.97641, -90.06218
29°58'35" N, 90°03'44" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:I0010 over I-10 EAST & WEST
Structure number:023604509006317
Location:.3 MI EAST OF LA 39
Purpose:Carries highway over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:143.1 ft. [43.6 m]
Total length:1300.9 ft. [396.5 m]
Roadway width between curbs:27.9 ft. [8.5 m]
Deck width edge-to-edge:33.1 ft. [10.1 m]
Vertical clearance above deck:21.0 ft. [6.4 m]
Vertical clearance below bridge:17.4 ft. [5.3 m]
Owner:State Highway Agency [01]
Year built:1968
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:8
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:8,150 [as of 2009]
Truck traffic:20% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:79.2 tons [72.0 metric tons]
Inventory rating:46.5 tons [42.3 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:78.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$5,073,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:9,465 [as of 1998]
Truck traffic:20% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Operating rating:62.4 tons [56.7 metric tons]
Inventory rating:37.6 tons [34.2 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:77.9
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$5,073,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:8,793 [as of 1991]
Truck traffic:20% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Operating rating:43.6 tons [39.6 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:80.2