LOCAL ROAD over RR YARD @ GALVEZ ST.
Map
Coordinates:
+29.97832, -90.0429829°58'42" N, 90°02'35" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | LOCAL ROAD over RR YARD @ GALVEZ ST. |
| Structure number: | 023629587900261 |
| Location: | 0.1MI.E.OF ALMONASTE |
| Purpose: | Carries highway and pedestrian walkway over highway and railroad |
| Route classification: | Local (Urban) [19] |
| Length of largest span: | 81.0 ft. [24.7 m] |
| Total length: | 1409.2 ft. [429.5 m] |
| Roadway width between curbs: | 28.5 ft. [8.7 m] |
| Deck width edge-to-edge: | 39.0 ft. [11.9 m] |
| Vertical clearance below bridge: | 11.2 ft. [3.4 m] |
| Owner: | City or Municipal Highway Agency [04] |
| Year built: | 1950 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 25 |
| Main spans material: | Steel continuous [4] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Deck condition: | Poor [4 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 40.6 tons [36.9 metric tons] |
| Inventory rating: | 24.8 tons [22.5 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 70.9 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $3,942,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Deck condition: | Poor [4 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Fair [5 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 40.6 tons [36.9 metric tons] |
| Inventory rating: | 24.8 tons [22.5 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 70.9 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $3,942,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Deck condition: | Poor [4 out of 9] |
| Superstructure condition: | Serious [3 out of 9] |
| Substructure condition: | Fair [5 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 40.6 tons [36.9 metric tons] |
| Inventory rating: | 24.8 tons [22.5 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 38.9 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $3,942,000 |