Share:

CITY STREET over LONDON AVENUE CANAL

Map 

Coordinates:
+30.02338, -90.07053
30°01'24" N, 90°04'14" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:CITY STREET over LONDON AVENUE CANAL
Structure number:023630014900421
Location:U3630014900421
Purpose:Carries highway over waterway
Route classification:Local (Urban) [19]
Length of largest span:45.9 ft. [14.0 m]
Total length:185.0 ft. [56.4 m]
Roadway width between curbs:65.9 ft. [20.1 m]
Deck width edge-to-edge:82.0 ft. [25.0 m]
Owner:City or Municipal Highway Agency [04]
Year built:2001
Historic significance:Historical significance is not determinable at this time [4]
Design load:MS 18 / HS 20 [5]
Number of main spans:4
Main spans material:Prestressed concrete [5]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge with "unknown" foundation that has not been evaluated for scour. [U]
Operating rating:43.6 tons [39.6 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:95.0

2000 Inspection 

Status:Bridge closed to all traffic [K]
Scour condition:Bridge with "unknown" foundation that has not been evaluated for scour. [U]
Operating rating:32.7 tons [29.7 metric tons]
Inventory rating:24.8 tons [22.5 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:32.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,047,000

1992 Inspection 

Status:Posted for load [P]
Deck condition:Fair [5 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge with "unknown" foundation that has not been evaluated for scour. [U]
Operating rating:32.7 tons [29.7 metric tons]
Inventory rating:24.8 tons [22.5 metric tons]
Sufficiency rating:84.9
Recommended work:Other structural work, including hydraulic replacements. [38]