Share:

CITY STREET over CITRUS CANAL

Map 

Coordinates:
+30.02945, -89.98056
30°01'46" N, 89°58'50" W
Source: National Bridge Inventory
Information not verified. Use at your own risk.

Facts 

Name:CITY STREET over CITRUS CANAL
Structure number:023630018895871
Location:0.1MI.E OF BUNDY ROA
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Local (Urban) [19]
Length of largest span:20.0 ft. [6.1 m]
Total length:79.1 ft. [24.1 m]
Roadway width between curbs:32.5 ft. [9.9 m]
Deck width edge-to-edge:39.4 ft. [12.0 m]
Skew angle:16°
Owner:City or Municipal Highway Agency [04]
Year built:1975
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:4
Main spans material:Concrete [1]
Main spans design:Slab [01]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: February 2015 

Status:Open, no restriction [A]
Average daily traffic:1,000 [as of 1970]
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Poor [4 out of 9]
Structural appraisal:Meets minimum tolerable limits to be left in place as is [4]
Deck geometry appraisal:Meets minimum tolerable limits to be left in place as is [4]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge with "unknown" foundation that has not been evaluated for scour. [U]
Operating rating:40.6 tons [36.9 metric tons]
Inventory rating:24.8 tons [22.5 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:60.7
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$330,000

Previous Inspections 

DateSuff. ratingEvaluationDeckSuper.Sub.ADT
February 201560.7Structurally deficientSatisfactorySatisfactoryPoor1000
February 201360.7Structurally deficientSatisfactorySatisfactoryPoor1000
March 201160.7Structurally deficientSatisfactorySatisfactoryPoor1000
April 200987.8Not deficientSatisfactorySatisfactorySatisfactory1000
March 200787.8Not deficientSatisfactoryGoodSatisfactory1000
June 200587.8Not deficientSatisfactoryGoodSatisfactory1000
May 200387.8Not deficientSatisfactoryGoodSatisfactory1000
December 200187.8Not deficientSatisfactoryGoodSatisfactory1000
June 199959.7Structurally deficientFairGoodPoor1000
July 199759.7Structurally deficientFairGoodPoor1000
June 199558.7Structurally deficientFairGoodPoor1000
May 199374.8Not deficientFairGoodFair1000
June 199159.7Structurally deficientFairGoodPoor1000