Share:

LOCAL ROAD over KANSAS CITY SOUTHERN RR

Map 

Coordinates:
+32.50664, -93.74863
32°30'24" N, 93°44'55" W
Source: National Bridge Inventory
Information not verified. Use at your own risk.

Facts 

Name:LOCAL ROAD over KANSAS CITY SOUTHERN RR
Structure number:040932304934491
Location:0.1 MI N OF I-20
Purpose:Carries highway over highway and railroad
Route classification:Local (Urban) [19]
Length of largest span:81.0 ft. [24.7 m]
Total length:692.0 ft. [210.9 m]
Roadway width between curbs:44.0 ft. [13.4 m]
Deck width edge-to-edge:52.2 ft. [15.9 m]
Vertical clearance below bridge:21.0 ft. [6.4 m]
Owner:City or Municipal Highway Agency [04]
Year built:1956
Year reconstructed:1987
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 13.5 / HS 15 [3]
Number of main spans:12
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]

Latest Available Inspection: March 2015 

Status:Open, no restriction [A]
Average daily traffic:15,612 [as of 1979]
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Equal to present minimum criteria [6]
Deck geometry appraisal:Basically intolerable requiring high priority of replacement [2]
Underclearances appraisal:Meets minimum tolerable limits to be left in place as is [4]
Roadway alignment appraisal:Equal to present minimum criteria [6]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge not over waterway. [N]
Operating rating:64.4 tons [58.5 metric tons]
Inventory rating:39.6 tons [36.0 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:77.1
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$3,054,000

Previous Inspections 

DateSuff. ratingEvaluationDeckSuper.Sub.ADT
March 201577.1Functionally obsoleteSatisfactorySatisfactorySatisfactory15612
March 201377.1Functionally obsoleteSatisfactorySatisfactorySatisfactory15612
March 201177.1Functionally obsoleteSatisfactorySatisfactorySatisfactory15612
March 200977.1Functionally obsoleteSatisfactorySatisfactorySatisfactory15612
April 200777.1Functionally obsoleteSatisfactorySatisfactorySatisfactory15612
March 200577.1Functionally obsoleteSatisfactorySatisfactorySatisfactory15612
March 200377.1Functionally obsoleteSatisfactoryGoodGood15612
February 200177.1Functionally obsoleteSatisfactoryGoodGood15612
March 199977.1Functionally obsoleteSatisfactoryGoodGood15612
February 199777.1Functionally obsoleteSatisfactoryGoodGood15612
February 199575.4Not deficientSatisfactoryGoodGood15612
March 199375.4Not deficientSatisfactoryGoodGood15612
April 199175.4Not deficientSatisfactoryGoodGood15612