US0061 over CLAYCUT BAYOU
Map
Coordinates:
+30.39122, -91.0471030°23'28" N, 91°02'50" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | US0061 over CLAYCUT BAYOU |
| Structure number: | 611700070804621 |
| Location: | US0061 |
| Purpose: | Carries highway over waterway |
| Route classification: | Other Principal Arterial (Urban) [14] |
| Length of largest span: | 20.0 ft. [6.1 m] |
| Total length: | 120.1 ft. [36.6 m] |
| Roadway width between curbs: | 40.0 ft. [12.2 m] |
| Deck width edge-to-edge: | 43.0 ft. [13.1 m] |
| Owner: | State Highway Agency [01] |
| Year built: | 1970 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 6 |
| Main spans material: | Concrete [1] |
| Main spans design: | Slab [01] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Bituminous [6] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 18,360 [as of 2009] |
| Truck traffic: | 11% of total traffic |
| Deck condition: | Very Good [8 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Operating rating: | 74.2 tons [67.5 metric tons] |
| Inventory rating: | 44.6 tons [40.5 metric tons] |
| Sufficiency rating: | 92.2 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 6,850 [as of 1997] |
| Truck traffic: | 11% of total traffic |
| Deck condition: | Very Good [8 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Very Good [8 out of 9] |
| Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Operating rating: | 78.2 tons [71.1 metric tons] |
| Inventory rating: | 47.5 tons [43.2 metric tons] |
| Sufficiency rating: | 92.3 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 9,478 [as of 1991] |
| Truck traffic: | 11% of total traffic |
| Deck condition: | Very Good [8 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Very Good [8 out of 9] |
| Channel protection: | Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8] |
| Scour condition: | Scour calculation/evaluation has not been made. [6] |
| Operating rating: | 78.2 tons [71.1 metric tons] |
| Inventory rating: | 47.5 tons [43.2 metric tons] |
| Sufficiency rating: | 92.2 |