Facts
| Name: | I0110 over I-110;US 190;0PS |
| Structure number: | 611704509205666 |
| Location: | 61174509205666 |
| Purpose: | Carries highway over highway |
| Route classification: | Principal Arterial - Interstate (Urban) [11] |
| Length of largest span: | 140.1 ft. [42.7 m] |
| Total length: | 2007.0 ft. [611.7 m] |
| Roadway width between curbs: | 24.9 ft. [7.6 m] |
| Deck width edge-to-edge: | 28.2 ft. [8.6 m] |
| Vertical clearance above deck: | 16.4 ft. [5.0 m] |
| Vertical clearance below bridge: | 24.3 ft. [7.4 m] |
| Owner: | State Highway Agency [01] |
| Year built: | 1976 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 18 |
| Main spans material: | Steel continuous [4] |
| Main spans design: | Box beam or girders - Multiple [05] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 6,900 [as of 2009] |
| Truck traffic: | 7% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 54.5 tons [49.5 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 70.0 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $7,827,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 6,190 [as of 1997] |
| Truck traffic: | 7% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Very Good [8 out of 9] |
| Channel protection: | Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8] |
| Operating rating: | 54.5 tons [49.5 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 71.0 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $7,827,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 7,251 [as of 1991] |
| Truck traffic: | 7% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Very Good [8 out of 9] |
| Channel protection: | Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8] |
| Operating rating: | 43.6 tons [39.6 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 71.0 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $7,827,000 |