Share:

LOCAL ROAD over MONTE SANO BAYOU

Map 

Coordinates:
+30.52882, -91.15884
30°31'44" N, 91°09'32" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:LOCAL ROAD over MONTE SANO BAYOU
Structure number:611730316910951
Location:B.R. METRO AIRPORT
Purpose:Carries highway over waterway
Route classification:Local (Urban) [19]
Length of largest span:19.0 ft. [5.8 m]
Total length:76.1 ft. [23.2 m]
Roadway width between curbs:24.0 ft. [7.3 m]
Deck width edge-to-edge:35.1 ft. [10.7 m]
Owner:County Highway Agency [02]
Year built:1987
Historic significance:Historical significance is not determinable at this time [4]
Design load:MS 18 / HS 20 [5]
Number of main spans:4
Main spans material:Concrete [1]
Main spans design:Slab [01]
Deck type:Concrete Cast-in-Place [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:10,626 [as of 1991]
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:43.6 tons [39.6 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:59.0
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$274,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:10,626 [as of 1991]
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:43.6 tons [39.6 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:61.0
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$274,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:10,626 [as of 1991]
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Operating rating:43.6 tons [39.6 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:61.0
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$274,000