Facts 

Name:HWY ARSENAL ST over WATER CHARLES RIVER
Structure number:B160154EFDOTNBI
Old structure number:MDC896007100 (from 1992 edition)
Location:CITY LINE WAT BOS
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Minor Arterial (Urban) [16]
Length of largest span:69.9 ft. [21.3 m]
Total length:203.1 ft. [61.9 m]
Roadway width between curbs:50.2 ft. [15.3 m]
Deck width edge-to-edge:64.0 ft. [19.5 m]
Vertical clearance below bridge:13.1 ft. [4.0 m]
Skew angle:40°
Owner:State Highway Agency [01]
Year built:1925
Year reconstructed:1968
Historic significance:Historical significance is not determinable at this time [4]
Number of main spans:2
Main spans material:Concrete [1]
Main spans design:Arch - Deck [11]
Deck type:Not applicable [N]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:40,000 [as of 2005]
Truck traffic:6% of total traffic
Superstructure condition:Fair [5 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge is scour critical; bridge foundations determined to be unstable. [3]
Operating rating:69.2 tons [62.9 metric tons]
Inventory rating:69.2 tons [62.9 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:58.3
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$5,030,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:8,900 [as of 1997]
Truck traffic:6% of total traffic
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:69.2 tons [62.9 metric tons]
Inventory rating:69.2 tons [62.9 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:77.4
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$2,923,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:18,500 [as of 1992]
Truck traffic:6% of total traffic
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Scour calculation/evaluation has not been made. [6]
Sufficiency rating:79.5
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$2,923,000