HWY N WSHNGTN ST over WATER CHARLES RIVER

Map 

Coordinates:
+42.36786, -71.05911
42°22'04" N, 71°03'33" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:HWY N WSHNGTN ST over WATER CHARLES RIVER
Structure number:B1601637MMUNNBI
Old structure number:37MMUN896C16100 (from 1992 edition)
Location:AT CHAS RIV NR BOS GARDEN
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:85.0 ft. [25.9 m]
Total length:423.9 ft. [129.2 m]
Roadway width between curbs:80.1 ft. [24.4 m]
Deck width edge-to-edge:101.1 ft. [30.8 m]
Owner:City or Municipal Highway Agency [04]
Year reconstructed:1956
Historic significance:Bridge is eligible for the National Register of Historic Places [2]
Number of main spans:5
Main spans material:Steel [3]
Main spans design:Girder and floorbeam system [03]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, would be posted or closed except for temporary shoring [D]
Average daily traffic:38,400 [as of 2008]
Truck traffic:10% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5]
Scour condition:Bridge with "unknown" foundation that has not been evaluated for scour. [U]
Operating rating:38.8 tons [35.3 metric tons]
Inventory rating:23.2 tons [21.1 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:48.1
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$26,105,000

2000 Inspection 

Status:Posted for load [P]
Average daily traffic:58,200 [as of 1998]
Truck traffic:10% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge with "unknown" foundation that has not been evaluated for scour. [U]
Operating rating:29.0 tons [26.4 metric tons]
Inventory rating:5.9 tons [5.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:24.0
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$9,658,000