Facts 

Name:US 1 NB/TOLL LOWR over OTHER RELIEF
Structure number:B160174X1MPANBI
Old structure number:MPA896T00111 (from 1992 edition)
Location:TOBIN BRIDGE
Route classification:Principal Arterial - Other Freeways or Expressways (Urban) [12]
Tolls:Yes [1]
Length of largest span:116.1 ft. [35.4 m]
Total length:1071.9 ft. [326.7 m]
Roadway width between curbs:36.1 ft. [11.0 m]
Deck width edge-to-edge:41.7 ft. [12.7 m]
Vertical clearance above deck:16.1 ft. [4.9 m]
Owner:Other State Agencies [21]
Year built:1950
Historic significance:Bridge is possibly eligible for the National Register of Historic Places [3]
Design load:MS 18 / HS 20 [5]
Number of main spans:12
Main spans material:Steel [3]
Main spans design:Girder and floorbeam system [03]
Deck type:Closed Grating [4]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:44,700 [as of 2007]
Truck traffic:10% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:49.5 tons [45.0 metric tons]
Inventory rating:31.7 tons [28.8 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:60.8
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$17,275,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:35,600 [as of 1997]
Truck traffic:10% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:72.3 tons [65.7 metric tons]
Inventory rating:36.6 tons [33.3 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:38.0
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$10,082,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:50,396 [as of 1990]
Truck traffic:10% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:54.5 tons [49.5 metric tons]
Inventory rating:36.6 tons [33.3 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:66.0
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$10,082,000