HWY CONGRESS ST over WATER FORT POINT CHANNEL
Map
Coordinates:
+42.35229, -71.0520942°21'08" N, 71°03'08" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | HWY CONGRESS ST over WATER FORT POINT CHANNEL |
| Structure number: | B1603238AMUNNBI |
| Old structure number: | 38AMUN896032100 (from 1992 edition) |
| Location: | OVER FT POINT CHANNEL |
| Purpose: | Carries highway and pedestrian walkway over waterway |
| Route classification: | Minor Arterial (Urban) [16] |
| Length of largest span: | 93.8 ft. [28.6 m] |
| Total length: | 546.9 ft. [166.7 m] |
| Roadway width between curbs: | 40.0 ft. [12.2 m] |
| Deck width edge-to-edge: | 45.6 ft. [13.9 m] |
| Vertical clearance above deck: | 25.6 ft. [7.8 m] |
| Vertical clearance below bridge: | 5.9 ft. [1.8 m] |
| Owner: | City or Municipal Highway Agency [04] |
| Year built: | 1850 |
| Year reconstructed: | 2009 |
| Historic significance: | Bridge is eligible for the National Register of Historic Places [2] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 2 |
| Main spans material: | Steel [3] |
| Main spans design: | Movable - Bascule [16] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Bituminous [6] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 14,600 [as of 2003] |
| Truck traffic: | 10% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Channel protection: | Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6] |
| Pier/abutment protection: | In place but in a deteriorated condition [3] |
| Operating rating: | 48.5 tons [44.1 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Sufficiency rating: | 76.6 |
2000 Inspection
| Status: | Open, posting recommended but not legally implemented [B] |
| Average daily traffic: | 1,900 [as of 1999] |
| Truck traffic: | 10% of total traffic |
| Deck condition: | Fair [5 out of 9] |
| Superstructure condition: | Poor [4 out of 9] |
| Substructure condition: | Critical [2 out of 9] |
| Channel protection: | Bank protection has failed. River control devices have been destroyed. Stream bed aggradation, degradation or lateral movement has changed the channel to now threaten the bridge and/or approach roadway. [3] |
| Pier/abutment protection: | In place but in a deteriorated condition [3] |
| Scour condition: | Scour calculation/evaluation has not been made. [6] |
| Operating rating: | 14.5 tons [13.2 metric tons] |
| Inventory rating: | 19.4 tons [17.6 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 37.6 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $9,555,000 |