Share:

HWY CONGRESS ST over WATER FORT POINT CHANNEL

Map 

Coordinates:
+42.35229, -71.05209
42°21'08" N, 71°03'08" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:HWY CONGRESS ST over WATER FORT POINT CHANNEL
Structure number:B1603238AMUNNBI
Old structure number:38AMUN896032100 (from 1992 edition)
Location:OVER FT POINT CHANNEL
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Minor Arterial (Urban) [16]
Length of largest span:93.8 ft. [28.6 m]
Total length:546.9 ft. [166.7 m]
Roadway width between curbs:40.0 ft. [12.2 m]
Deck width edge-to-edge:45.6 ft. [13.9 m]
Vertical clearance above deck:25.6 ft. [7.8 m]
Vertical clearance below bridge:5.9 ft. [1.8 m]
Owner:City or Municipal Highway Agency [04]
Year built:1850
Year reconstructed:2009
Historic significance:Bridge is eligible for the National Register of Historic Places [2]
Design load:MS 18 / HS 20 [5]
Number of main spans:2
Main spans material:Steel [3]
Main spans design:Movable - Bascule [16]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:14,600 [as of 2003]
Truck traffic:10% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Pier/abutment protection:In place but in a deteriorated condition [3]
Operating rating:48.5 tons [44.1 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:76.6

2000 Inspection 

Status:Open, posting recommended but not legally implemented [B]
Average daily traffic:1,900 [as of 1999]
Truck traffic:10% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Critical [2 out of 9]
Channel protection:Bank protection has failed. River control devices have been destroyed. Stream bed aggradation, degradation or lateral movement has changed the channel to now threaten the bridge and/or approach roadway. [3]
Pier/abutment protection:In place but in a deteriorated condition [3]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:14.5 tons [13.2 metric tons]
Inventory rating:19.4 tons [17.6 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:37.6
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$9,555,000