Share:

HWY HYDE PARK AV over WATER MOTHER BROOK

Map 

Coordinates:
+42.25128, -71.12565
42°15'05" N, 71°07'32" W
Source: National Bridge Inventory
Information not verified. Use at your own risk.

Facts 

Name:HWY HYDE PARK AV over WATER MOTHER BROOK
Structure number:B1603538CMUNNBI
Old structure number:38CMUN896035100 (from 1992 edition)
Location:.48 KM S OF CLEARY SQ
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:53.2 ft. [16.2 m]
Total length:59.1 ft. [18.0 m]
Roadway width between curbs:33.1 ft. [10.1 m]
Deck width edge-to-edge:49.9 ft. [15.2 m]
Skew angle:15°
Owner:City or Municipal Highway Agency [04]
Year built:1991
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Main span material:Steel [3]
Main span design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

Latest Available Inspection: May 2015 

Status:Open, no restriction [A]
Average daily traffic:17,500 [as of 2015]
Truck traffic:20% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Good [7 out of 9]
Structural appraisal:Better than present minimum criteria [7]
Deck geometry appraisal:Meets minimum tolerable limits to be left in place as is [4]
Water adequacy appraisal:Basically intolerable requiring high priority of corrrective action [3]
Roadway alignment appraisal:Better than present minimum criteria [7]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:81.8 tons [74.4 metric tons]
Inventory rating:49.1 tons [44.6 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:89.2
Recommended work:Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Estimated cost of work:$848,000

Previous Inspections 

DateSuff. ratingEvaluationDeckSuper.Sub.ADT
May 201589.2Functionally obsoleteGoodVery GoodGood17500
May 201389.4Functionally obsoleteVery GoodVery GoodGood15900
May 201189.4Functionally obsoleteVery GoodVery GoodGood15900
May 200989.4Functionally obsoleteVery GoodVery GoodGood15900
May 200789.4Functionally obsoleteVery GoodVery GoodVery Good15700
May 200590.5Functionally obsoleteVery GoodVery GoodVery Good15300
May 200390.5Functionally obsoleteVery GoodVery GoodVery Good14500
May 200190.4Functionally obsoleteVery GoodVery GoodVery Good16100
May 199989.8Not deficientVery GoodVery GoodVery Good22100
May 199792.0Not deficientVery GoodVery GoodVery Good19900
May 199581.2Not deficientVery GoodVery GoodVery Good19900