Share:

ST 9 HUNTINGTN AV over COMB I 90 & MBTA/CSX

Map 

Coordinates:
+42.34778, -71.07889
42°20'52" N, 71°04'44" W
Source: National Bridge Inventory (2010 edition)
Information not verified. Use at your own risk.

Facts 

Name:ST 9 HUNTINGTN AV over COMB I 90 & MBTA/CSX
Structure number:B160494T8DOTNBI
Location:.1 MI S.PRU CENTER S57
Purpose:Carries highway and pedestrian walkway over highway and railroad
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:79.1 ft. [24.1 m]
Total length:307.1 ft. [93.6 m]
Roadway width between curbs:101.1 ft. [30.8 m]
Deck width edge-to-edge:123.4 ft. [37.6 m]
Vertical clearance below bridge:14.4 ft. [4.4 m]
Skew angle:51°
Owner:State Highway Agency [01]
Year built:1965
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:5
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:19,900 [as of 1997]
Truck traffic:7% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:47.9 tons [43.5 metric tons]
Inventory rating:36.0 tons [32.7 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:75.3
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$14,702,000