HWY BENNINGTN ST over RR CSX

Map 

Coordinates:
+42.37972, -71.02611
42°22'47" N, 71°01'34" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:HWY BENNINGTN ST over RR CSX
Structure number:B160713GYDOT634
Old structure number:3GY900896071100 (from 1992 edition)
Location:1000FT S OF SUFFOLK DOWNS
Purpose:Carries highway and pedestrian walkway over railroad
Route classification:Minor Arterial (Urban) [16]
Length of largest span:60.0 ft. [18.3 m]
Total length:63.0 ft. [19.2 m]
Roadway width between curbs:127.6 ft. [38.9 m]
Deck width edge-to-edge:151.6 ft. [46.2 m]
Vertical clearance below bridge:15.7 ft. [4.8 m]
Skew angle:52°
Owner:State Highway Agency [01]
Year built:1906
Year reconstructed:1982
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Main span material:Steel [3]
Main span design:Girder and floorbeam system [03]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:36,300 [as of 2010]
Truck traffic:12% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:60.2 tons [54.7 metric tons]
Inventory rating:38.6 tons [35.1 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:89.4
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$386,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:31,000 [as of 2000]
Truck traffic:13% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:60.2 tons [54.7 metric tons]
Inventory rating:38.6 tons [35.1 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:91.0
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$1,002,000