Share:

HWY DORCHSTR AVE over COMB HAUL RD & CSX

Map 

Coordinates:
+42.33861, -71.05750
42°20'19" N, 71°03'27" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:HWY DORCHSTR AVE over COMB HAUL RD & CSX
Structure number:B161993H6DOT634
Old structure number:3H6900896199100 (from 1992 edition)
Location:1.8 KM SW OF D ST
Purpose:Carries highway and pedestrian walkway over highway and railroad
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:48.2 ft. [14.7 m]
Total length:101.4 ft. [30.9 m]
Roadway width between curbs:47.9 ft. [14.6 m]
Deck width edge-to-edge:60.0 ft. [18.3 m]
Vertical clearance below bridge:17.4 ft. [5.3 m]
Skew angle:47°
Owner:State Highway Agency [01]
Year built:1917
Year reconstructed:1959
Historic significance:Historical significance is not determinable at this time [4]
Number of main spans:2
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:30,900 [as of 2007]
Truck traffic:6% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:48.2 tons [43.8 metric tons]
Inventory rating:25.4 tons [23.1 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:49.7
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$2,362,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:31,700 [as of 1999]
Truck traffic:13% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:48.2 tons [43.8 metric tons]
Inventory rating:25.4 tons [23.1 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:49.6
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$2,429,000