HWY JAMAICAWAY over ST 9 HUNTNGTON AVE
Map
Coordinates:
+42.33167, -71.1130642°19'54" N, 71°06'47" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | HWY JAMAICAWAY over ST 9 HUNTNGTON AVE |
| Structure number: | B162223F3DOTNBI |
| Old structure number: | 3F3445896104101 (from 1992 edition) |
| Location: | JCT US 1 & ST 9 |
| Purpose: | Carries highway over highway |
| Route classification: | Other Principal Arterial (Urban) [14] |
| Length of largest span: | 116.8 ft. [35.6 m] |
| Total length: | 120.1 ft. [36.6 m] |
| Roadway width between curbs: | 60.0 ft. [18.3 m] |
| Deck width edge-to-edge: | 69.9 ft. [21.3 m] |
| Vertical clearance below bridge: | 13.5 ft. [4.1 m] |
| Skew angle: | 10° |
| Owner: | State Highway Agency [01] |
| Year built: | 1936 |
| Historic significance: | Bridge is possibly eligible for the National Register of Historic Places [3] |
| Design load: | M 13.5 / H 15 [2] |
| Main span material: | Steel [3] |
| Main span design: | Frame [07] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Bituminous [6] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 60,000 [as of 2009] |
| Truck traffic: | 1% of total traffic |
| Deck condition: | Fair [5 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 47.3 tons [43.0 metric tons] |
| Inventory rating: | 13.4 tons [12.2 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 47.5 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $3,280,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 45,000 [as of 1998] |
| Truck traffic: | 1% of total traffic |
| Deck condition: | Fair [5 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 47.3 tons [43.0 metric tons] |
| Inventory rating: | 13.4 tons [12.2 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 47.5 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $1,995,000 |