Facts 

Name:ST 1 A over HWY CHELSEA & BREMEN S
Structure number:B1623539TDOTNBI
Old structure number:39T041896135101 (from 1992 edition)
Location:1000FT NE OF CALLHAN TUN.
Purpose:Carries highway over highway
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:83.0 ft. [25.3 m]
Total length:379.9 ft. [115.8 m]
Roadway width between curbs:87.6 ft. [26.7 m]
Deck width edge-to-edge:93.2 ft. [28.4 m]
Vertical clearance above deck:17.1 ft. [5.2 m]
Vertical clearance below bridge:15.4 ft. [4.7 m]
Owner:State Highway Agency [01]
Year built:1951
Year reconstructed:1977
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:5
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:40,500 [as of 2009]
Truck traffic:8% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:65.7 tons [59.7 metric tons]
Inventory rating:39.3 tons [35.7 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:79.4
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$13,705,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:27,000 [as of 1997]
Truck traffic:7% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:48.5 tons [44.1 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:81.9
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$3,723,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:20,412 [as of 1990]
Truck traffic:7% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:48.5 tons [44.1 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:93.4