ST 1 A over HWY CHELSEA & BREMEN S
Map
Coordinates:
+42.37278, -71.0355642°22'22" N, 71°02'08" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | ST 1 A over HWY CHELSEA & BREMEN S |
| Structure number: | B1623539TDOTNBI |
| Old structure number: | 39T041896135101 (from 1992 edition) |
| Location: | 1000FT NE OF CALLHAN TUN. |
| Purpose: | Carries highway over highway |
| Route classification: | Other Principal Arterial (Urban) [14] |
| Length of largest span: | 83.0 ft. [25.3 m] |
| Total length: | 379.9 ft. [115.8 m] |
| Roadway width between curbs: | 87.6 ft. [26.7 m] |
| Deck width edge-to-edge: | 93.2 ft. [28.4 m] |
| Vertical clearance above deck: | 17.1 ft. [5.2 m] |
| Vertical clearance below bridge: | 15.4 ft. [4.7 m] |
| Owner: | State Highway Agency [01] |
| Year built: | 1951 |
| Year reconstructed: | 1977 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 5 |
| Main spans material: | Steel [3] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Bituminous [6] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 40,500 [as of 2009] |
| Truck traffic: | 8% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Fair [5 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 65.7 tons [59.7 metric tons] |
| Inventory rating: | 39.3 tons [35.7 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 79.4 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $13,705,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 27,000 [as of 1997] |
| Truck traffic: | 7% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Fair [5 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 48.5 tons [44.1 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 81.9 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $3,723,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 20,412 [as of 1990] |
| Truck traffic: | 7% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 48.5 tons [44.1 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 93.4 |