Share:

I 93 /US1/ST3 over HWY MORRISSEY BLVD

Map 

Coordinates:
+42.30083, -71.04917
42°18'03" N, 71°02'57" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:I 93 /US1/ST3 over HWY MORRISSEY BLVD
Structure number:B162623DEDOTNBI
Old structure number:3DE093896017101 (from 1992 edition)
Location:4 MI S OF JCT I90&I93
Purpose:Carries highway over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:95.1 ft. [29.0 m]
Total length:195.9 ft. [59.7 m]
Roadway width between curbs:109.9 ft. [33.5 m]
Deck width edge-to-edge:117.1 ft. [35.7 m]
Vertical clearance below bridge:14.8 ft. [4.5 m]
Skew angle:35°
Owner:State Highway Agency [01]
Year built:1958
Year reconstructed:1986
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:2
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:186,700 [as of 2009]
Truck traffic:11% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:48.5 tons [44.1 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:79.0
Recommended work:Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Estimated cost of work:$4,255,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:176,570 [as of 1997]
Truck traffic:10% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:48.5 tons [44.1 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:83.0
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$5,169,000