I 93 SB BT 61-B5 over RR BMRR

Map 

Coordinates:
+42.37972, -71.07667
42°22'47" N, 71°04'36" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:I 93 SB BT 61-B5 over RR BMRR
Structure number:B162813BVDOTNBI
Old structure number:3BV09383607V101 (from 1992 edition)
Location:0.24 MI S OF CAMBRIDGE ST
Purpose:Carries highway over railroad
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:83.0 ft. [25.3 m]
Total length:486.9 ft. [148.4 m]
Roadway width between curbs:44.6 ft. [13.6 m]
Deck width edge-to-edge:57.1 ft. [17.4 m]
Vertical clearance above deck:16.4 ft. [5.0 m]
Vertical clearance below bridge:39.4 ft. [12.0 m]
Owner:State Highway Agency [01]
Year built:1970
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Number of main spans:6
Main spans material:Steel [3]
Main spans design:Girder and floorbeam system [03]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:72,100 [as of 2008]
Truck traffic:6% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:48.5 tons [44.1 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:57.6
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$10,786,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:64,000 [as of 1999]
Truck traffic:12% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:48.5 tons [44.1 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:58.7
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$2,915,000