I 93 NB ON RMP over I 93 SB
Map
Coordinates:
+42.38167, -71.0766742°22'54" N, 71°04'36" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | I 93 NB ON RMP over I 93 SB |
| Structure number: | B162813CEDOTNBI |
| Old structure number: | 3CE093896F1V101 (from 1992 edition) |
| Location: | .8 MI N OF JCT I93&US1 |
| Purpose: | Carries highway over highway and railroad |
| Route classification: | Principal Arterial - Other Freeways or Expressways (Urban) [12] |
| Length of largest span: | 77.1 ft. [23.5 m] |
| Total length: | 299.9 ft. [91.4 m] |
| Roadway width between curbs: | 22.0 ft. [6.7 m] |
| Deck width edge-to-edge: | 44.9 ft. [13.7 m] |
| Vertical clearance below bridge: | 15.7 ft. [4.8 m] |
| Skew angle: | 99° |
| Owner: | State Highway Agency [01] |
| Year built: | 1970 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18+Mod / HS 20+Mod [6] |
| Number of main spans: | 4 |
| Main spans material: | Steel [3] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Bituminous [6] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 24,300 [as of 2008] |
| Truck traffic: | 4% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 48.5 tons [44.1 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Sufficiency rating: | 93.7 |
| Recommended work: | Widening of existing bridge or other major structure without deck rehabilitation or replacement [33] |
| Estimated cost of work: | $1,103,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 21,854 [as of 2000] |
| Truck traffic: | 6% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 48.5 tons [44.1 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Sufficiency rating: | 93.9 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $6,075,000 |
1992 Inspection
| Status: | Bridge closed to all traffic [K] |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 39.0 |