HWY S BOS BPS RD over HWY FRONTAGE RD NB

Source: National Bridge Inventory (2010 edition)
Information not verified. Use at your own risk.

Facts 

Name:HWY S BOS BPS RD over HWY FRONTAGE RD NB
Structure number:B16644928DOTNBI
Location:BOSTON, MASS AVE. INT.
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:68.2 ft. [20.8 m]
Total length:258.2 ft. [78.7 m]
Roadway width between curbs:57.4 ft. [17.5 m]
Deck width edge-to-edge:63.3 ft. [19.3 m]
Owner:State Highway Agency [01]
Year built:1998
Historic significance:Historical significance is not determinable at this time [4]
Design load:MS 18 / HS 20 [5]
Number of main spans:5
Main spans material:Prestressed concrete continuous [6]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Latex Concrete or similar additive [3]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:4,300 [as of 2009]
Truck traffic:46% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:48.5 tons [44.1 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:93.6
Recommended work:Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Estimated cost of work:$3,629,000