HWY S BOS BYPASS over COMB AMTRAK/MBTA&RED LN
Map
Coordinates:
+42.33389, -71.0625042°20'02" N, 71°03'45" W
Source: National Bridge Inventory (2010 edition)
Information not verified. Use at your own risk.
Facts
| Name: | HWY S BOS BYPASS over COMB AMTRAK/MBTA&RED LN |
| Structure number: | B166457GDDOTNBI |
| Location: | .6 MI S OF JCT I 90, I 93 |
| Purpose: | Carries highway over railroad |
| Route classification: | Minor Arterial (Urban) [16] |
| Length of largest span: | 200.1 ft. [61.0 m] |
| Total length: | 1822.6 ft. [555.5 m] |
| Roadway width between curbs: | 31.8 ft. [9.7 m] |
| Deck width edge-to-edge: | 36.1 ft. [11.0 m] |
| Vertical clearance below bridge: | 23.0 ft. [7.0 m] |
| Owner: | State Highway Agency [01] |
| Year built: | 1995 |
| Historic significance: | Historical significance is not determinable at this time [4] |
| Design load: | MS 22.5 / HS 25 [9] |
| Number of main spans: | 10 |
| Main spans material: | Steel continuous [4] |
| Main spans design: | Box beam or girders - Multiple [05] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Latex Concrete or similar additive [3] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 11,650 [as of 1995] |
| Truck traffic: | 90% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 26.5 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $25,441,000 |