HWY FRNT RD NB over HWY S BOS BYPASS RD
Source: National Bridge Inventory (2010 edition)
Information not verified. Use at your own risk.
Facts
| Name: | HWY FRNT RD NB over HWY S BOS BYPASS RD |
| Structure number: | B1664791KDOTNBI |
| Location: | MASS AVE. INT. |
| Route classification: | Local (Urban) [19] |
| Length of largest span: | 73.8 ft. [22.5 m] |
| Total length: | 149.0 ft. [45.4 m] |
| Roadway width between curbs: | 40.0 ft. [12.2 m] |
| Deck width edge-to-edge: | 50.9 ft. [15.5 m] |
| Owner: | State Highway Agency [01] |
| Year built: | 2000 |
| Historic significance: | Historical significance is not determinable at this time [4] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 2 |
| Main spans material: | Prestressed concrete continuous [6] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Latex Concrete or similar additive [3] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 22,100 [as of 2009] |
| Truck traffic: | 8% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 48.5 tons [44.1 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 78.3 |
| Recommended work: | Widening of existing bridge or other major structure without deck rehabilitation or replacement [33] |
| Estimated cost of work: | $4,549,000 |