Facts 

Name:HWY FARLEY RD over WATER MILLERS RIVER
Structure number:E100060LGMUNNBI
Old structure number:0LGMUN216004100 (from 1992 edition)
Location:.05 MI E OF RTE 2
Purpose:Carries highway over waterway
Route classification:Major Collector (Rural) [07]
Length of largest span:123.0 ft. [37.5 m]
Total length:127.0 ft. [38.7 m]
Roadway width between curbs:13.8 ft. [4.2 m]
Deck width edge-to-edge:16.1 ft. [4.9 m]
Vertical clearance above deck:16.1 ft. [4.9 m]
Owner:Town or Township Highway Agency [03]
Year built:1889
Historic significance:Bridge is eligible for the National Register of Historic Places [2]
Design load:M 9 / H 10 [1]
Main span material:Aluminum, Wrought Iron or Cast Iron [9]
Main span design:Truss - Thru [10]
Deck type:Wood or Timber [8]
Wearing surface:Wood or Timber [7]

Latest Available Inspection: January 2016 

Status:Posted for load [P]
Average daily traffic:140 [as of 2014]
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Structural appraisal:Meets minimum tolerable limits to be left in place as is [4]
Deck geometry appraisal:Basically intolerable requiring high priority of replacement [2]
Water adequacy appraisal:Better than present minimum criteria [7]
Roadway alignment appraisal:Equal to present minimum criteria [6]
Channel protection:Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5]
Scour condition:Bridge is scour critical; bridge foundations determined to be unstable. [3]
Operating rating:17.7 tons [16.1 metric tons]
Inventory rating:13.2 tons [12.0 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:39.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$4,306,000

Previous Inspections 

DateSuff. ratingEvaluationDeckSuper.Sub.ADT
January 201639.0Functionally obsoleteSatisfactoryFairFair140
January 201439.0Functionally obsoleteSatisfactoryFairFair140
January 201236.5Structurally deficientSatisfactoryFairSatisfactory1425
January 201020.4Structurally deficientSatisfactoryFairPoor1425
January 200820.4Structurally deficientGoodFairPoor1425
January 200623.7Structurally deficientGoodFairPoor320
January 200423.8Structurally deficientGoodFairPoor280
January 200223.8Structurally deficientGoodFairPoor280
January 200038.9Functionally obsoleteGoodFairFair280
January 199846.8Structurally deficientGoodSatisfactorySatisfactory800
November 199543.5Functionally obsoleteGoodSatisfactorySatisfactory300