Share:

CHARLES STREET RAM over PENN ST. PARKING LOT

Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:CHARLES STREET RAM over PENN ST. PARKING LOT
Structure number:200000BC1101010
Location:AT CHARLES ST. OVER I-83
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:92.9 ft. [28.3 m]
Total length:184.1 ft. [56.1 m]
Roadway width between curbs:42.0 ft. [12.8 m]
Deck width edge-to-edge:59.1 ft. [18.0 m]
Owner:City or Municipal Highway Agency [04]
Year built:2003
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 22.5 / HS 25 [9]
Number of main spans:2
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:18,990 [as of 2007]
Truck traffic:5% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Inventory rating:63.4 tons [57.6 metric tons]
Sufficiency rating:93.1
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$1,000

2000 Inspection 

Status:Open, posting recommended but not legally implemented [B]
Average daily traffic:27,082 [as of 1994]
Truck traffic:8% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Poor [4 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:60.4 tons [54.9 metric tons]
Inventory rating:32.7 tons [29.7 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:66.7
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$240,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:27,082 [as of 1988]
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:60.4 tons [54.9 metric tons]
Inventory rating:32.7 tons [29.7 metric tons]
Sufficiency rating:96.5