Share:

I-83 over ON RAMP TO NB I-83

Map 

Coordinates:
+39.31237, -76.62549
39°18'45" N, 76°37'32" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:I-83 over ON RAMP TO NB I-83
Structure number:200000BC1105010
Location:I-83 OV RAMP FROM N. AVE
Purpose:Carries highway over highway
Route classification:Principal Arterial - Other Freeways or Expressways (Urban) [12]
Length of largest span:62.0 ft. [18.9 m]
Total length:65.9 ft. [20.1 m]
Roadway width between curbs:102.0 ft. [31.1 m]
Deck width edge-to-edge:105.3 ft. [32.1 m]
Vertical clearance below bridge:14.8 ft. [4.5 m]
Skew angle:30°
Owner:City or Municipal Highway Agency [04]
Year built:1959
Year reconstructed:1988
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Main span material:Steel [3]
Main span design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:31,400 [as of 2007]
Truck traffic:8% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:48.5 tons [44.1 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:89.4
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$57,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:27,082 [as of 1994]
Truck traffic:8% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:48.5 tons [44.1 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:90.0
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$8,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:27,082 [as of 1988]
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:22.8 tons [20.7 metric tons]
Inventory rating:19.8 tons [18.0 metric tons]
Sufficiency rating:68.6