Share:

CHARLES STREET over AMTRAK

Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:CHARLES STREET over AMTRAK
Structure number:200000BC1210010
Location:0.2 MI N OF MT ROYAL AVE
Purpose:Carries highway and pedestrian walkway over railroad
Route classification:Local (Urban) [19]
Length of largest span:66.9 ft. [20.4 m]
Total length:235.9 ft. [71.9 m]
Roadway width between curbs:44.0 ft. [13.4 m]
Deck width edge-to-edge:65.9 ft. [20.1 m]
Vertical clearance below bridge:18.4 ft. [5.6 m]
Skew angle:33°
Owner:City or Municipal Highway Agency [04]
Year built:2003
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 22.5 / HS 25 [9]
Number of main spans:4
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:18,800 [as of 2007]
Truck traffic:5% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:89.1 tons [81.0 metric tons]
Inventory rating:53.5 tons [48.6 metric tons]
Sufficiency rating:73.6
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$1,000

2000 Inspection 

Status:Posted for load [P]
Average daily traffic:4,919 [as of 1994]
Truck traffic:10% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Serious [3 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:7.9 tons [7.2 metric tons]
Inventory rating:5.0 tons [4.5 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:9.2
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$3,400,000

1992 Inspection 

Status:Posted for load [P]
Average daily traffic:4,919 [as of 1988]
Deck condition:Poor [4 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Serious [3 out of 9]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:9.9 tons [9.0 metric tons]
Inventory rating:5.0 tons [4.5 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:11.2