Share:

FULTON AVENUE over I-170

Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:FULTON AVENUE over I-170
Structure number:200000BC1211010
Location:0.1 MI S OF FRANKLIN ST
Purpose:Carries highway and pedestrian walkway over highway
Route classification:Principal Arterial - Other Freeways or Expressways (Urban) [12]
Length of largest span:77.1 ft. [23.5 m]
Total length:222.1 ft. [67.7 m]
Roadway width between curbs:64.0 ft. [19.5 m]
Deck width edge-to-edge:89.9 ft. [27.4 m]
Vertical clearance below bridge:33.1 ft. [10.1 m]
Owner:City or Municipal Highway Agency [04]
Year built:1975
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Concrete continuous [2]
Main spans design:Box Beam or girders - Single or Spread [06]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:5,600 [as of 2007]
Truck traffic:8% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge not over waterway. [N]
Operating rating:91.1 tons [82.8 metric tons]
Inventory rating:40.6 tons [36.9 metric tons]
Sufficiency rating:91.5
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$41,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:4,919 [as of 1994]
Truck traffic:8% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge not over waterway. [N]
Operating rating:91.1 tons [82.8 metric tons]
Inventory rating:40.6 tons [36.9 metric tons]
Sufficiency rating:91.5
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$41,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:4,919 [as of 1988]
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:91.1 tons [82.8 metric tons]
Inventory rating:40.6 tons [36.9 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:91.6