Share:

MULBERRY STREET over PEARL STREET

Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:MULBERRY STREET over PEARL STREET
Structure number:200000BC1213010
Location:0.1 MI W OF PACA ST
Purpose:Carries highway and pedestrian walkway over highway
Route classification:Local (Urban) [19]
Length of largest span:61.0 ft. [18.6 m]
Total length:64.0 ft. [19.5 m]
Roadway width between curbs:44.0 ft. [13.4 m]
Deck width edge-to-edge:56.8 ft. [17.3 m]
Vertical clearance above deck:15.7 ft. [4.8 m]
Vertical clearance below bridge:14.1 ft. [4.3 m]
Owner:City or Municipal Highway Agency [04]
Year built:1975
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Main span material:Concrete [1]
Main span design:Box Beam or girders - Single or Spread [06]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:22,594 [as of 2007]
Truck traffic:5% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:95.0 tons [86.4 metric tons]
Inventory rating:39.6 tons [36.0 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:76.2
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$14,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:19,625 [as of 1994]
Truck traffic:5% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:95.0 tons [86.4 metric tons]
Inventory rating:39.6 tons [36.0 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:76.6
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$5,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:19,625 [as of 1973]
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:95.0 tons [86.4 metric tons]
Inventory rating:39.6 tons [36.0 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:77.0