Facts 

Name:GILMOR STREET over I-170
Structure number:200000BC1408010
Location:0.1 MI N OF SARATOGA ST
Purpose:Carries highway and pedestrian walkway over highway
Route classification:Local (Urban) [19]
Length of largest span:77.1 ft. [23.5 m]
Total length:188.0 ft. [57.3 m]
Roadway width between curbs:51.8 ft. [15.8 m]
Deck width edge-to-edge:69.9 ft. [21.3 m]
Vertical clearance below bridge:15.4 ft. [4.7 m]
Owner:City or Municipal Highway Agency [04]
Year built:1975
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Concrete continuous [2]
Main spans design:Box Beam or girders - Single or Spread [06]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:3,055 [as of 2007]
Truck traffic:5% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge not over waterway. [N]
Operating rating:88.1 tons [80.1 metric tons]
Inventory rating:38.6 tons [35.1 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:80.4
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$23,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:2,500 [as of 1994]
Truck traffic:5% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge not over waterway. [N]
Operating rating:88.1 tons [80.1 metric tons]
Inventory rating:38.6 tons [35.1 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:80.5
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$39,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:2,500 [as of 1981]
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:88.1 tons [80.1 metric tons]
Inventory rating:38.6 tons [35.1 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:82.5