US 40 EDMONDSON AV over GWYNNS FALLS, CSX
Map
Coordinates:
+39.29427, -76.6700039°17'39" N, 76°40'12" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | US 40 EDMONDSON AV over GWYNNS FALLS, CSX |
| Structure number: | 200000BC2202010 |
| Location: | 0.2 MI E HILTON PKWY |
| Purpose: | Carries highway and pedestrian walkway over highway, waterway, and railroad |
| Route classification: | Collector (Urban) [17] |
| Length of largest span: | 147.0 ft. [44.8 m] |
| Total length: | 396.0 ft. [120.7 m] |
| Roadway width between curbs: | 76.1 ft. [23.2 m] |
| Deck width edge-to-edge: | 87.9 ft. [26.8 m] |
| Vertical clearance below bridge: | 44.0 ft. [13.4 m] |
| Owner: | City or Municipal Highway Agency [04] |
| Year built: | 1907 |
| Year reconstructed: | 1970 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 4 |
| Main spans material: | Concrete [1] |
| Main spans design: | Arch - Deck [11] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Bituminous [6] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 3,900 [as of 2007] |
| Truck traffic: | 8% of total traffic |
| Deck condition: | Fair [5 out of 9] |
| Superstructure condition: | Serious [3 out of 9] |
| Substructure condition: | Fair [5 out of 9] |
| Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
| Pier/abutment protection: | None present but re-evaluation suggested [5] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Operating rating: | 52.5 tons [47.7 metric tons] |
| Inventory rating: | 34.7 tons [31.5 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 49.5 |
| Recommended work: | Other structural work, including hydraulic replacements. [38] |
| Estimated cost of work: | $7,700,000 |
2000 Inspection
| Status: | Open, posting recommended but not legally implemented [B] |
| Average daily traffic: | 3,382 [as of 1994] |
| Truck traffic: | 8% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Channel protection: | Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8] |
| Pier/abutment protection: | None present but re-evaluation suggested [5] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Operating rating: | 52.5 tons [47.7 metric tons] |
| Inventory rating: | 34.7 tons [31.5 metric tons] |
| Sufficiency rating: | 83.2 |
| Recommended work: | Other structural work, including hydraulic replacements. [38] |
| Estimated cost of work: | $153,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 3,382 [as of 1988] |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Channel protection: | Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 52.5 tons [47.7 metric tons] |
| Inventory rating: | 34.7 tons [31.5 metric tons] |
| Sufficiency rating: | 95.2 |