US 40 EDMONDSON AV over GWYNNS FALLS, CSX

Map 

Coordinates:
+39.29427, -76.67000
39°17'39" N, 76°40'12" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:US 40 EDMONDSON AV over GWYNNS FALLS, CSX
Structure number:200000BC2202010
Location:0.2 MI E HILTON PKWY
Purpose:Carries highway and pedestrian walkway over highway, waterway, and railroad
Route classification:Collector (Urban) [17]
Length of largest span:147.0 ft. [44.8 m]
Total length:396.0 ft. [120.7 m]
Roadway width between curbs:76.1 ft. [23.2 m]
Deck width edge-to-edge:87.9 ft. [26.8 m]
Vertical clearance below bridge:44.0 ft. [13.4 m]
Owner:City or Municipal Highway Agency [04]
Year built:1907
Year reconstructed:1970
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:4
Main spans material:Concrete [1]
Main spans design:Arch - Deck [11]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:3,900 [as of 2007]
Truck traffic:8% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Serious [3 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Pier/abutment protection:None present but re-evaluation suggested [5]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:52.5 tons [47.7 metric tons]
Inventory rating:34.7 tons [31.5 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:49.5
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$7,700,000

2000 Inspection 

Status:Open, posting recommended but not legally implemented [B]
Average daily traffic:3,382 [as of 1994]
Truck traffic:8% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Pier/abutment protection:None present but re-evaluation suggested [5]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:52.5 tons [47.7 metric tons]
Inventory rating:34.7 tons [31.5 metric tons]
Sufficiency rating:83.2
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$153,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:3,382 [as of 1988]
Deck condition:Good [7 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge not over waterway. [N]
Operating rating:52.5 tons [47.7 metric tons]
Inventory rating:34.7 tons [31.5 metric tons]
Sufficiency rating:95.2