BALTIMORE ST over GWYNNS FALLS, CSX

Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:BALTIMORE ST over GWYNNS FALLS, CSX
Structure number:200000BC2402010
Location:0.2 MI E HILTON PKWY
Purpose:Carries highway and pedestrian walkway over railroad and waterway
Route classification:Local (Urban) [19]
Length of largest span:113.9 ft. [34.7 m]
Total length:326.1 ft. [99.4 m]
Roadway width between curbs:42.0 ft. [12.8 m]
Deck width edge-to-edge:55.8 ft. [17.0 m]
Vertical clearance below bridge:29.9 ft. [9.1 m]
Owner:City or Municipal Highway Agency [04]
Year built:1931
Year reconstructed:2000
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 22.5 / HS 25 [9]
Number of main spans:3
Main spans material:Concrete [1]
Main spans design:Arch - Deck [11]
Deck type:Concrete Cast-in-Place [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:8,570 [as of 2007]
Truck traffic:10% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge is scour critical; bridge foundations determined to be unstable. [3]
Operating rating:39.6 tons [36.0 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:80.0
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$27,000

2000 Inspection 

Status:Bridge closed to all traffic [K]
Average daily traffic:13,427 [as of 1994]
Truck traffic:5% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Poor [4 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Pier/abutment protection:None present but re-evaluation suggested [5]
Scour condition:Bridge is scour critical; bridge foundations determined to be unstable. [3]
Operating rating:13.9 tons [12.6 metric tons]
Inventory rating:7.9 tons [7.2 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:3.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$3,666,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:13,427 [as of 1988]
Superstructure condition:Serious [3 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5]
Scour condition:Bridge not over waterway. [N]
Evaluation:Structurally deficient [1]
Sufficiency rating:2.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]