I-83 NB OFF RAMP over MTA LIGHT RAIL
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | I-83 NB OFF RAMP over MTA LIGHT RAIL |
| Structure number: | 200000BC3109010 |
| Location: | 0.9 MI N OF NORTH AVE |
| Purpose: | Carries highway over railroad |
| Route classification: | Principal Arterial - Interstate (Urban) [11] |
| Length of largest span: | 95.1 ft. [29.0 m] |
| Total length: | 99.1 ft. [30.2 m] |
| Roadway width between curbs: | 32.2 ft. [9.8 m] |
| Deck width edge-to-edge: | 35.1 ft. [10.7 m] |
| Vertical clearance below bridge: | 22.0 ft. [6.7 m] |
| Skew angle: | 28° |
| Owner: | City or Municipal Highway Agency [04] |
| Year built: | 1957 |
| Year reconstructed: | 1987 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | M 18 / H 20 [4] |
| Main span material: | Steel [3] |
| Main span design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Integral Concrete (separate non-modified layer of concrete added to structural deck) [2] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 23,800 [as of 2007] |
| Truck traffic: | 10% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 76.2 tons [69.3 metric tons] |
| Inventory rating: | 38.6 tons [35.1 metric tons] |
| Sufficiency rating: | 96.7 |
| Recommended work: | Other structural work, including hydraulic replacements. [38] |
| Estimated cost of work: | $17,000 |
2000 Inspection
| Status: | Open, posting recommended but not legally implemented [B] |
| Average daily traffic: | 20,499 [as of 1994] |
| Truck traffic: | 10% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 58.4 tons [53.1 metric tons] |
| Inventory rating: | 31.7 tons [28.8 metric tons] |
| Sufficiency rating: | 94.8 |
| Recommended work: | Other structural work, including hydraulic replacements. [38] |
| Estimated cost of work: | $2,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 20,499 [as of 1988] |
| Deck condition: | Very Good [8 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
| Scour condition: | Scour calculation/evaluation has not been made. [6] |
| Operating rating: | 25.7 tons [23.4 metric tons] |
| Inventory rating: | 13.9 tons [12.6 metric tons] |
| Sufficiency rating: | 62.3 |