Share:

I-83 over ON RAMP FROM FALLS RD

Map 

Coordinates:
+39.32492, -76.63419
39°19'30" N, 76°38'03" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:I-83 over ON RAMP FROM FALLS RD
Structure number:200000BC3112010
Location:JFX OVER FALLS RD ON RAMP
Purpose:Carries highway over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:68.9 ft. [21.0 m]
Total length:118.1 ft. [36.0 m]
Roadway width between curbs:105.0 ft. [32.0 m]
Deck width edge-to-edge:108.3 ft. [33.0 m]
Vertical clearance below bridge:14.4 ft. [4.4 m]
Owner:City or Municipal Highway Agency [04]
Year built:1959
Year reconstructed:1987
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:2
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:23,810 [as of 2007]
Truck traffic:8% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:65.3 tons [59.4 metric tons]
Inventory rating:36.6 tons [33.3 metric tons]
Sufficiency rating:92.6
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$40,000

2000 Inspection 

Status:Open, posting recommended but not legally implemented [B]
Average daily traffic:20,499 [as of 1994]
Truck traffic:8% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:66.3 tons [60.3 metric tons]
Inventory rating:39.6 tons [36.0 metric tons]
Sufficiency rating:93.0
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$18,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:20,499 [as of 1988]
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:39.6 tons [36.0 metric tons]
Inventory rating:22.8 tons [20.7 metric tons]
Sufficiency rating:76.1