Facts 

Name:CEDONIA AVE over MOORES RUN
Structure number:200000BC4213010
Location:0.7 MI S RADECKE AVE
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Local (Urban) [19]
Length of largest span:81.0 ft. [24.7 m]
Total length:86.0 ft. [26.2 m]
Roadway width between curbs:44.0 ft. [13.4 m]
Deck width edge-to-edge:56.1 ft. [17.1 m]
Skew angle:45°
Owner:City or Municipal Highway Agency [04]
Year built:1962
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Main span material:Steel [3]
Main span design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:16,700 [as of 2007]
Truck traffic:5% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:78.2 tons [71.1 metric tons]
Inventory rating:45.5 tons [41.4 metric tons]
Sufficiency rating:84.2
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$151,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:13,837 [as of 1994]
Truck traffic:5% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:78.2 tons [71.1 metric tons]
Inventory rating:45.5 tons [41.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:66.0
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$78,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:13,837 [as of 1988]
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge not over waterway. [N]
Operating rating:42.6 tons [38.7 metric tons]
Inventory rating:22.8 tons [20.7 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:52.8