MORAVIA ROAD over BIDDISON RUN
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | MORAVIA ROAD over BIDDISON RUN |
| Structure number: | 200000BC4256020 |
| Location: | 0.2 MI N OF IS 895 |
| Purpose: | Carries highway over waterway |
| Route classification: | Local (Urban) [19] |
| Total length: | 39.0 ft. [11.9 m] |
| Skew angle: | 50° |
| Owner: | City or Municipal Highway Agency [04] |
| Year built: | 1966 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Main span material: | Concrete [1] |
| Main span design: | Culvert [19] |
| Deck type: | Not applicable [N] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 22,575 [as of 2007] |
| Truck traffic: | 5% of total traffic |
| Channel protection: | Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6] |
| Culvert condition: | Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. [7] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Sufficiency rating: | 80.4 |
| Recommended work: | Other structural work, including hydraulic replacements. [38] |
| Estimated cost of work: | $22,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 18,900 [as of 1994] |
| Truck traffic: | 5% of total traffic |
| Channel protection: | Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6] |
| Culvert condition: | Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. [7] |
| Scour condition: | Scour calculation/evaluation has not been made. [6] |
| Sufficiency rating: | 96.2 |
| Recommended work: | Other structural work, including hydraulic replacements. [38] |
| Estimated cost of work: | $19,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 9,634 [as of 1988] |
| Channel protection: | Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6] |
| Culvert condition: | Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. [7] |
| Scour condition: | Bridge not over waterway. [N] |
| Sufficiency rating: | 82.1 |