Share:

PATAPSCO AVENUE over MD 295, B/W PARKWAY

Map 

Coordinates:
+39.25019, -76.64247
39°15'01" N, 76°38'33" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:PATAPSCO AVENUE over MD 295, B/W PARKWAY
Structure number:200000BC5204010
Location:0.2 MI W OF RTE 648
Purpose:Carries highway and pedestrian walkway over highway
Route classification:Local (Urban) [19]
Length of largest span:57.1 ft. [17.4 m]
Total length:283.2 ft. [86.3 m]
Roadway width between curbs:87.9 ft. [26.8 m]
Deck width edge-to-edge:100.1 ft. [30.5 m]
Vertical clearance below bridge:17.4 ft. [5.3 m]
Skew angle:17°
Owner:City or Municipal Highway Agency [04]
Year built:1960
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:4
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:3,800 [as of 2007]
Truck traffic:5% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge not over waterway. [N]
Operating rating:89.1 tons [81.0 metric tons]
Inventory rating:53.5 tons [48.6 metric tons]
Sufficiency rating:98.5
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$27,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:3,300 [as of 1994]
Truck traffic:5% of total traffic
Deck condition:Excellent [9 out of 9]
Superstructure condition:Excellent [9 out of 9]
Substructure condition:Excellent [9 out of 9]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge not over waterway. [N]
Operating rating:89.1 tons [81.0 metric tons]
Inventory rating:53.5 tons [48.6 metric tons]
Sufficiency rating:98.5
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$10,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:20,704 [as of 1988]
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Poor [4 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:57.4 tons [52.2 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:64.3