Share:

HANOVER STREET over MIDDLE BRANCH

Map 

Coordinates:
+39.25986, -76.61543
39°15'36" N, 76°36'56" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:HANOVER STREET over MIDDLE BRANCH
Structure number:200000BC5210010
Location:0.5 MI S OF I 95
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Local (Urban) [19]
Length of largest span:229.0 ft. [69.8 m]
Total length:2023.1 ft. [616.6 m]
Roadway width between curbs:60.0 ft. [18.3 m]
Deck width edge-to-edge:71.9 ft. [21.9 m]
Vertical clearance below bridge:36.7 ft. [11.2 m]
Owner:City or Municipal Highway Agency [04]
Year built:1916
Year reconstructed:1992
Historic significance:Bridge is eligible for the National Register of Historic Places [2]
Design load:MS 18 / HS 20 [5]
Main span material:Steel [3]
Main span design:Movable - Bascule [16]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:14,220 [as of 2007]
Truck traffic:8% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Pier/abutment protection:In place and functioning [2]
Scour condition:Bridge is scour critical; bridge foundations determined to be unstable. [3]
Operating rating:50.5 tons [45.9 metric tons]
Inventory rating:32.7 tons [29.7 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:76.1
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$769,000

2000 Inspection 

Status:Open, posting recommended but not legally implemented [B]
Average daily traffic:12,700 [as of 1994]
Truck traffic:8% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Pier/abutment protection:In place and functioning [2]
Scour condition:Bridge is scour critical; bridge foundations determined to be unstable. [3]
Operating rating:50.5 tons [45.9 metric tons]
Inventory rating:32.7 tons [29.7 metric tons]
Sufficiency rating:76.3
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$167,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:20,704 [as of 1988]
Deck condition:Good [7 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Serious [3 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge not over waterway. [N]
Evaluation:Structurally deficient [1]
Sufficiency rating:23.0
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]