MONROE STREET VIAD over CSX
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | MONROE STREET VIAD over CSX |
| Structure number: | 200000BC5214010 |
| Location: | 0.1 MI NW OF I-95 |
| Purpose: | Carries highway and pedestrian walkway over highway and railroad |
| Route classification: | Local (Urban) [19] |
| Length of largest span: | 160.1 ft. [48.8 m] |
| Total length: | 891.1 ft. [271.6 m] |
| Roadway width between curbs: | 53.5 ft. [16.3 m] |
| Deck width edge-to-edge: | 61.0 ft. [18.6 m] |
| Vertical clearance above deck: | 19.0 ft. [5.8 m] |
| Vertical clearance below bridge: | 23.3 ft. [7.1 m] |
| Owner: | City or Municipal Highway Agency [04] |
| Year built: | 1955 |
| Year reconstructed: | 2006 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 9 |
| Main spans material: | Prestressed concrete [5] |
| Main spans design: | Box beam or girders - Multiple [05] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 12,000 [as of 2007] |
| Truck traffic: | 10% of total traffic |
| Deck condition: | Excellent [9 out of 9] |
| Superstructure condition: | Excellent [9 out of 9] |
| Substructure condition: | Excellent [9 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 62.4 tons [56.7 metric tons] |
| Inventory rating: | 36.6 tons [33.3 metric tons] |
| Sufficiency rating: | 81.6 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $12,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 16,700 [as of 1994] |
| Truck traffic: | 5% of total traffic |
| Deck condition: | Poor [4 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Fair [5 out of 9] |
| Pier/abutment protection: | Navigation protection not required [1] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 79.2 tons [72.0 metric tons] |
| Inventory rating: | 47.5 tons [43.2 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 56.2 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $1,070,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 11,684 [as of 1988] |
| Deck condition: | Fair [5 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Fair [5 out of 9] |
| Scour condition: | Scour calculation/evaluation has not been made. [6] |
| Operating rating: | 79.2 tons [72.0 metric tons] |
| Inventory rating: | 47.5 tons [43.2 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 63.5 |