MONROE STREET VIAD over CSX

Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:MONROE STREET VIAD over CSX
Structure number:200000BC5214010
Location:0.1 MI NW OF I-95
Purpose:Carries highway and pedestrian walkway over highway and railroad
Route classification:Local (Urban) [19]
Length of largest span:160.1 ft. [48.8 m]
Total length:891.1 ft. [271.6 m]
Roadway width between curbs:53.5 ft. [16.3 m]
Deck width edge-to-edge:61.0 ft. [18.6 m]
Vertical clearance above deck:19.0 ft. [5.8 m]
Vertical clearance below bridge:23.3 ft. [7.1 m]
Owner:City or Municipal Highway Agency [04]
Year built:1955
Year reconstructed:2006
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:9
Main spans material:Prestressed concrete [5]
Main spans design:Box beam or girders - Multiple [05]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:12,000 [as of 2007]
Truck traffic:10% of total traffic
Deck condition:Excellent [9 out of 9]
Superstructure condition:Excellent [9 out of 9]
Substructure condition:Excellent [9 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:62.4 tons [56.7 metric tons]
Inventory rating:36.6 tons [33.3 metric tons]
Sufficiency rating:81.6
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$12,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:16,700 [as of 1994]
Truck traffic:5% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge not over waterway. [N]
Operating rating:79.2 tons [72.0 metric tons]
Inventory rating:47.5 tons [43.2 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:56.2
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,070,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:11,684 [as of 1988]
Deck condition:Fair [5 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:79.2 tons [72.0 metric tons]
Inventory rating:47.5 tons [43.2 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:63.5