Share:

ANNAPOLIS ROAD over GWYNNS FALLS

Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:ANNAPOLIS ROAD over GWYNNS FALLS
Structure number:200000BC5301010
Location:0.1 MI E RUSSELL ST
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Local (Urban) [19]
Length of largest span:91.9 ft. [28.0 m]
Total length:188.0 ft. [57.3 m]
Roadway width between curbs:36.1 ft. [11.0 m]
Deck width edge-to-edge:42.7 ft. [13.0 m]
Owner:City or Municipal Highway Agency [04]
Year built:1974
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:2
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:9,896 [as of 2007]
Truck traffic:5% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Pier/abutment protection:None present but re-evaluation suggested [5]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inventory rating:69.3 tons [63.0 metric tons]
Sufficiency rating:97.1
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$22,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:7,250 [as of 1994]
Truck traffic:5% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Pier/abutment protection:None present but re-evaluation suggested [5]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inventory rating:69.3 tons [63.0 metric tons]
Sufficiency rating:97.3
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$17,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:7,250 [as of 1973]
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Poor [4 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge not over waterway. [N]
Inventory rating:69.3 tons [63.0 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:70.2