PHOENIX ROAD over GREENE BRANCH
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | PHOENIX ROAD over GREENE BRANCH |
| Structure number: | 200000BC6504010 |
| Location: | 0.03 MI N PAPER MILL RD |
| Purpose: | Carries highway over waterway |
| Route classification: | Local (Rural) [09] |
| Length of largest span: | 51.8 ft. [15.8 m] |
| Total length: | 56.1 ft. [17.1 m] |
| Roadway width between curbs: | 29.9 ft. [9.1 m] |
| Deck width edge-to-edge: | 35.1 ft. [10.7 m] |
| Owner: | City or Municipal Highway Agency [04] |
| Year built: | 1967 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Main span material: | Steel [3] |
| Main span design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Bituminous [6] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 2,000 [as of 2007] |
| Truck traffic: | 5% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Channel protection: | Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Operating rating: | 60.4 tons [54.9 metric tons] |
| Inventory rating: | 42.6 tons [38.7 metric tons] |
| Sufficiency rating: | 91.5 |
| Recommended work: | Other structural work, including hydraulic replacements. [38] |
| Estimated cost of work: | $28,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 1,500 [as of 1994] |
| Truck traffic: | 5% of total traffic |
| Deck condition: | Very Good [8 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Operating rating: | 60.4 tons [54.9 metric tons] |
| Inventory rating: | 42.6 tons [38.7 metric tons] |
| Sufficiency rating: | 91.6 |
| Recommended work: | Other structural work, including hydraulic replacements. [38] |
| Estimated cost of work: | $37,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 1,500 [as of 1973] |
| Deck condition: | Very Good [8 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 60.4 tons [54.9 metric tons] |
| Inventory rating: | 42.6 tons [38.7 metric tons] |
| Sufficiency rating: | 92.6 |